RESIDUAL WASTE INCINERATION PLANT (A) 

Contract volume: 15.6 Mio.€

Subject: DELIVERY OF WATER-STEAM-CYCLE INCL. TURBINE FOR RESIDUAL WASTE INCINERATION PLANT LINZ – LOS 3

Scope of supply:

  Execution of all engineering works (process engineering, plant- and detailed engineering)

Delivery and installation of water-steam-cycle, connecting pipelines, steam-, condenser-, feed water- and cooling water system, district heat extraction, turbine, condenser, pumps, coolers, compressed air system, infrastructure

  Commissioning

Location: Linz (A)

Execution period: 2011

 

 

Technical data:

  • boiler 90 t/h steam – turbine 21 Mwel
  • Steam parameter intermediate pressure: 32 barü, 390°C, up to 90 t/h
  • Steam parameter live steam: 45 barü, 420°C