LIST OF REFERENCES PLANT CONSTRUCTION 

LocationProjectDimensionOutputFlue gas volume Sector
Oberösterreich (A)Shut Down - Wet scrubber, SCR- and heat-transfer-system

Maintenance and delivery of the catalyst
120.000 Nm³/hPower plant
Nordrhein-Westfalen (D)Steam filter station SW-route incl. auxiliary systems for the waste-to-energy plant Wuppertal

Scope of supply:
- Engineering (Construction, static)
- Fabrication
- Supply and installation (Turbine, steam pressure reducing units
demineralization system, condensate treatment system,
chemical supply, deionized water tank, power house for back
pressure turbo set, pipe bridge, condensate- and municipal
water pipes)
Waste incineration
Berlin (D)Hot water generating plant

Scope of supply:
Complete plant construction
- Engineering - Detail-/Basic Engineering, process engineering
- Boiler construction - 3x40MW Gas-Hotwater boiler
- Piping incl. connection to the existing district heating grid
- Pumps
- E, I&C (T3000)
- Chimney system
3x40MWPower plant
Basel (CH)Plant construction for heat storage unit Dolder

Installation of a heat storage unit for the buffering of performance peaks in the district heating grid and for the optimization of the production facility´s operation in the building of the former heating station Dolder

Scope of supply:
- Engineering (zB preparation of a plant concept, process engineering)
- HAZOP
- Supply and installation of equipment, instruments, pumps, components e. g. heat
storage unit, internal piping, stainless steel casing, pipe conduit ports, secondary
supports, etc.)
- E I&C, programming
- Commissioning
Heating supply
Oberösterreich (A)EPC Projekt: DK WAB Steam boiler plant

Scope of supply:
- Engineering
- Fabrication
- Material supply
- Erection works
- Optimizations
- Commissioning
- Documentation
- Training of the operating personnel
Power plant
Nordrhein-Westfalen (D)Revamp Continuous slab caster 3

Scope of supply:
Detail Engineering, prefabrication, delivery and erection of equipment
DN15 - DN300Metallurgy
Pilsner Region (CZE)Flue gas cleaning facility for waste-to-energy plant

Scope of supply:
Delivery, erection and commissioning of the entire flue gas cleaning plant:
Spray dryer, fabric filter, 2-stage flue gas cleaning, DeNOx/DeDiox facility, heat exchanger, suction draught fan, conveying of residual material, media supply of all plant parts
Waste volume:
95.000 t/Jahr

Flue gas volume:
85.000 Nm3/h
Waste incineration
Wien (A)EPC-project: Turn-key installation of a district heating plant in Vienna

EPC contractor for design/engineering, supply, installation and start-up
of a turn-key district heating power station incl. warm water storage 1.000 m2

Scope of supply:
- Basic and detail engineering
- Civil works (Company HABAU)
- Supply of all main components such as steel structure, machines, piping, hot water boiler
2x170MW
- Installation of all components
- Commissioning and trial run
Thermal output: 340 MW/thPower plant
Steiermark (A)Shortfall buffer, Container Puchstrasse

Supply and installation of 3 containers, each equipped with 1 pc. astebo gas-hotwater boiler consisting of:
- Container boiler house
- Hot water boiler
- Burner installations
- Plant control system
- 3-ligned chimney
- Piping
7,08 MW
16 bar, 130 °C
Heating supply
Kärnten (A)Erection of a new central heating plant for the production of district heating incl. switch of fuels from oil to gas

Scope of supply:
General engineering and configuration, mass determination, production, packing,
transport and delivery, Installation, acceptances and commissioning, trial run, documentation and completion

Delivery of main components:
- 3 pcs. Hot-water boiler - 33 MW/each as threepass system
- 3 pcs. District heating pumps for the district heating grid
- Piping and access facilities
- Pressure maintaining- and degasification facility, mechanical secondary structures
- Electric- and instrumentation facilities
3x33MWPower plant
Oberösterreich (A)Engineering and erection of a soil vapour extraction during environmental remediation:

Scope of supply:
- Planning and erection of soil vapour extraction
- Exhaust air cleaning with catalytic after burning
- Delivery of analysis container with GC/FID
- Process engineering and general engineering
- Safety related evaluation incl. ATEX
- Commissioning
36 controlled systems

99,9% separation output
Metallurgy
Baden-Württemberg (D)District heating plant
Design, supply, installation and start-up of a bio-mass incineration

Scope of supply:
Hydraulic feed grate incineration for wood chips, hot water boiler, hot water storage,
flue gas treatment, E & I control system
2x10 MWth2 lines
10 MW th
Power plant
Biomass
Südbayern (D)Optimisation of energy balance in heat recovery power station of cement mill

Scope of supply:
Installation of turbine, air condensor, Bop piping
Power plant
Wien (A)Delivery of a turnkey waste recycling plant for residual waste

Scope of supply:
Material-take-over, processing, screening, conveyors, squeezers, bailing system;
Plant infrastructure, erection, startup, test run;
Waste delivery:
280.000 t/year
Power plant
Baden-Württemberg (D)Delivery of a biomass power plant incl. hot steam boiler

Scope of supply:
Engineering, delivery installation, commissioning (March 2013)
18 t/h
P=38 bar (g)
t=440°C
Power plant
Waadt (CH)Delivery of a biomass power plant incl. hot steam boiler

Scope of supply:
Engineering, delivery installation, commissioning (March 2013)
up to 40.000 Nm3/h

boiler 13 MW th
Power plant
Yonne (F)Biomass heating station - Hydraulic feed grate incineration for wood chips, warm water boiler, flue gas treatment2x3 MWthPower plant
Oslo (NOR)Domestic waste incineration plant Oslo 3 - delivery of a complete water-steam-cycle with main aggregates for a waste incinery

Scope of supply:
Supply and installation of the water-steam-cycle incl. connecting pipelines, entire piping, equipment, supports, engineering (process-, plant-, and detailed engineering, commissioning management), supply of the steam-, condensate- and feed water system, pumps, turbine for feed water pump, cooler, infrastructure
77 t/h
40 bar
Power plant
London (UK)Waste incineration plant London, UK
Detail engineering of a complete water-steam-cycle with all main aggregates for a 3-ligned waste incinery

Scope of supply:
Detail engineering, fabrication drawings including static calculation
3 lines each 80 MWthPower plant
Oberösterreich (A)Residual waste incineration plant LOS 3
Complete delivery of a turbine system, 21,6MWel, with water-steam-cycle for a residue-fired cogeneration plant incl. district heating transfer station and district heating system, cooling water system

Scope of supply:
Entire engineering, process- and plant engineering, supply and installation of water-steam-cycle incl. connecting pipelines of the steam-, condensate- and feed water system, cooling water system, district heat extraction, turbine, condenser, pumps, cooler, pressure maintenance system, infrastructure, commissioning management
Turbine
21,6 MW el

boiler 90to/h steam

Intermediate pressure 32 barü/390°C, 90t/h

Live steam 45 barü/420°C
Power plant
ChinaBasic and detailed engineering incl. static analysis for Polymer-pipelinesChemistry
Schleswig-Holstein (D)District heating station - turn key biomass plant with peak-load boiler (oil) and building, construction, 7 MW th

Scope of supply:
Hydraulic feed grate incineration for wood chips, warm water boiler, warm water storage,
flue gas treatment, thermo oil boiler, piping, power plant building
design, supply and installation of E & I control system
3MWthPower plant
Biomass
Hessen (D)Erection of a complete heat recovery boiler plant incl. boiler components (steamdrum, blow off tank, ECO), air ducts and internal/external piping

Scope of supply:
Installation of 750 t boiler parts and piping
High pressure steam output 130t/h, 140 bar, 525°CPower plant
Niederbayern (D)Sewage sludge incineration plant with hot air turbine

Scope of supply:
Supply, installation and commissioning for an incinery with wheel grate incineration for a sewage plant, heat recovery with special vessel, flue gas treatment
0,8 MWth
0,1 MWel
Power plant
Prag (CZE)Cogeneration and Denox plants for the municipal waste incinery Prague - extension of existing waste incinery

Scope of supply:
Delivery of a turbine system, 17MWel, with water-steam-cycle for a waste incinery with 4 lines, district heating station and district heating system 35MW, 4 x heat-transfer-system
17 MW el
steam 120to/h
FW 35 MWth
4 x 75.000Nm³/hPower plant
Steiermark (A)Engineering and installation of the new steam-water-circuit,
power unit 1

Scope of supply:
- Engineering (Detailed engineering, assistance of the client with process engineering)
- Supply main components
- Connecting- and entire piping
- Feed water tank
- Pumps
- Installation
- Assistance commissioning
3 boiler (total 240 t/h) -
3 turbines
25/17/11 MW
Power plant
Hordaland (NOR)Delivery of a complete water-steam-cycle with main aggregates for waste incinery Bergen 2

Scope of supply:
Engineering, supply/installation: water-steam-cycle, connecting pipelines, instruments, supports, feed water system, pumps, coolers, infrastructure, erection supervision, commissioning, trial run
boiler 55 t/hPower plant
Niederösterreich (A)Domestic waste incineration plant Zistersdorf - Water-steam-cycle

Scope of supply:
Basic engineering, supply and installation incl. piping, instruments, supports, process engineering, plant- and detail engineering, feed water system, pumps, coolers, infrastructure, commissioning
Power plant
Oberösterreich (A)Plastic injection system - Blast Furnace A

Turn key supply of a plant for the acquisition, storage, processing and conveying of plastic pellets for Blast Furnace A, system incl. intake, silo, sieving, conveyor

Technical data:
2006: First expansion stage
2009: Full expansion
Lines: 1
Supply dumping stations: 3 pcs. with full expansion
Conveyor system to silo: 250 m3/h
Silo: 800 m³/each, 5 pcs. with full expansion
Silo output: 100 m³/h
Sieving facility: 100 m³/h
Pneumat. conveyor: 100 m³/h
100 m3/h to blast furnace AMetallurgy
Tarragona (ES)Replacement of burner and lance for the retrofit of a hazardous-waste-combustion plant including adaptation of the safety control system
Power plant
Oberösterreich (A)Can MSS

Delivery of a new indirectly heated outer cover for a new rotary kiln plant for the production of MgSO3
Work temperature coat 800°CPower plant
Oberösterreich (A)Delivery of a heat recovery boiler K14 including piping and utilities supply, control system

Scope of supply:
Engineering, design, delivery, erection, commissioning
12 to/hPower plant
Skåne län (SWE)Waste incinery Malmö, Line 4, Water-steam-cycle

Scope uf supply: Turnkey delivery of plant piping for a waste incinery in Sweden:
- Detailengineering
- Layout and delivery of all required valves, pumps and local measurement points
- Delivery of 200m3 deionized-water-tank, 150m3 oil tank, expansion vessel
- Delivery und installation of all pipe systems (stainless steel, carbon steel)
- Commissioning, documentation
Power plant
Niederösterreich (A)Turnkey delivery of a plant for the heat treatment of residual gases out of bottles

- Plant type: Incineration/Flue gas cleaning - DENOX
- System: Static combustion chamber, honeycomb catalyst
- No. of lines: 1
- Geometry: Chamber diam. 1,0 m - length 3,6 m
- Incineration temp.: 850 °C
- Retention time: > 2 s
- Flue gas temp. 850 / 300 °C
- NOx reduction from 5000 mg/Nm³ to 100 mg/Nm³
- Separation efficiency 98%
Thermial output: 0,3 MW850 / 1200 Nm³/hPower plant
Prag (CZE)Dedioxin plant for domestic waste incinery
Retrofitting of the existing waste incineration plant with a DeDioxin (PCDD/F) separation

Scope of supply:
The entire plant was built-in between the existing electrostatic precipitators and the 2-stage flue gas scrubbers. All 4 DeDioxin systems are equipped with honeycomb catalysts. By the means of these catalysts, the dioxines and furanes (PCDD/PCDF) are reduced from 2 ng/Nm³ down to 0,07 ng/Nm³. Separation efficiency of the plant: 96,5 %

Total weight of steel structure and piping: 450 t
4x 15 t/h waste volume4x 75.000Nm³/hPower plant
Oberösterreich (A)Donausäge Rumpelmayr

Scope of supply:
Erection of a complete 30MW biomass boiler construction incl. boiler components (1., 2., 3. pass; ECO), air shrouds and internal/external piping incl. detailed engineering;
Installation of approx. 500 t boiler parts and piping within 3 months
Steam output
29t/h, 66 bar,
485°C
Power plant
Niederösterreich (A)Biomass boiler plant incl. boiler components

Scope of supply:
Erection of a complete 30MW biomass boiler construction incl. boiler components (1., 2.,
3. pass; ECO), air shrouds and internal/external piping incl. detailed engineering;
Installation of approx. 450 t boiler parts and piping within 3 months
Steam output
29 t/h, 70 bar,
505°C
Power plant
Niederösterreich (A)Biomass boiler plant incl. boiler components

Scope of supply:
Erection of a complete 30MW biomass boiler construction incl. boiler components (1., 2.,
3. pass; ECO), air shrouds and internal/external piping incl. detailed engineering;
Installation of approx. 450 t boiler parts and piping within 3 months
Steam output
29 t/h, 70 bar,
505°C
Power plant
Baden-Württemberg (A)Natural gas storage Haidach - Engineering, supply and installation of the package unit boiler house including flue gas installation

Scope of supply:
2 x hot water boiler 4,5MW and 1 x 1,2 MW for hot water treatment for the entire gas storage, 3 x gas pressure reducer station incl. required piping, planning-delivery-installation of the entire piping, insulation steel construction, flue gas installation with combustion air heating system, triple-draftier-exhaust stack, delivery and installation of the heating system for the building
Power plant