PIPING PRODUCTION BUILDING (D)

Contract volume: 20 Mio.€

Location: Dreieich (D)

Auftragsgegenstand: ERECTION OF A NEW PRODUCTION BUILDING FOR PRODUCING PHARMACEUTICAL PRODUCTS MADE OF BLOOD PLASM, GVR & HK PIPING (CLEAN AND BLACK PIPING)

Auftragsumfang:

 Project- and assembly management

Material procurement

 Prefabrication and installation of 38,000 m piping

Steel structure for supports, insulation

QA/QC (100% NDT for clean piping)

Documentation

Materials: High quality stainless steel for clean piping, carbon steel, plastics

Execution period: 2015 – 2017

Copyright: Scherr + Klimke