PIPING PRODUCTION BUILDING (D) 

Contract volume: 20 Mio.€

Location: Dreieich (D)

Subject: ERECTION OF A NEW PRODUCTION BUILDING FOR PRODUCING PHARMACEUTICAL PRODUCTS MADE OF BLOOD PLASM, GVR & HK PIPING (CLEAN AND BLACK PIPING)

Auftragsumfang:

  Project- and assembly management

  Material procurement

  Prefabrication and installation of 38,000 m piping

  Steel structure for supports, insulation

  QA/QC (100% NDT for clean piping)

  Documentation

  Materials: High quality stainless steel for clean piping, carbon steel, plastics

Execution period: 2015 – 2017

Dreieich