FLUE GAS TREATMENT (CZ) 

Contract volume: 19 Mio.€

Subject: FLUE GAS TREATMENT FOR THE WtE PLANT CHOTIKOV

Scope of supply:

  Supply, erection and commissioning of the entire flue gas cleaning system

  Spray dryer and tissue filter

Heat exchanger and draught ventilator

  2-stage flue gas washer

  DeNOx/DeDiox system

  Infeed of operational substances to the plant sections

Execution period: 2013 – 2016

 

 

Chotikov

Technical data:

  • Waste volume: 95.000 t/year
  • Flue gas volume 85.000 Nm3/h