Steam Filter Station (GER)

Contract volume: ca. 14,2 Mio.€

Subject: Steam filter station incl. auxiliary systems for the waste-to-energy plant

Scope of supply:

  • Execution of the entire engineering scope incl. process engineering, plant- and detailed engineering
  • Supply and installation of the water-steam-cycle, connecting pipelines, steam-, condensate- and feed water system, cooling water system, civil construction, pipe bridge, turbine, demineralization system, condensate cleaning, chemical storage- and dosing system, pumps, E I&C (electrical incl. control technology), infrastructure
  • Commissioning

Technical Data:

  • Back pressure turbine: 8MW
  • Steam parameter high pressure steam: 34-36 bara, 385°C, up to 130 t/h
  • Steam parameter medium pressure steam: 7-17 barü 200-220°C

Place of execution: Wuppertal (GER)

Execution period: 2017