Snow Generation System (AT) - Zaunergroup
ENDE

Snow Generation System (AT)

Subject: Annual expansion of the snow generation system

Scope of sypply:

  • Piping and mechanical equipment for storage reservoir, intake structure, water catchments, main pumping stations, intermediate pumping stations (pressure increase), valve shafts (exterior valve stations)
  • Installation of water lines (steel, cast iron, PE-HD)
  • Delivery and installation of tapping points and hydrants for snow generation

Place of execution: Angertal, Gastein (AT)

Execution period: 2007 – 2016