Residual Waste Incineration Plant (AT)

Contract volume: ca. 15,6 Mio.€

Subject: Delivery of water-steam-cycle incl. turbine for residual waste incineratoin plant

Scope of supply:

  • Execution of all engineering works (process engineering, plant- and detailed engineering)
  • Delivery and installation of water-steam-cycle, connecting pipelines, steam-, condenser-, feed water- and cooling water system, district heat extraction, turbine, condenser, pumps, coolers, compressed air system, infrastructure
  • Commissioning

Technical Data:

  • boiler 90 t/h steam – turbine 21 Mwel
  • Steam parameter intermediate pressure: 32 barü, 390°C, up to 90 t/h
  • Steam parameter live steam: 45 barü, 420°C

Place of execution: Linz (A)

Execution period: 2011