Piping of combined cycle power plant (F)

Contract volume: ca. 7 Mio.€

Subject: 430 MW, Combined cycle power plant

Scope of supply:

  • Installation of connecting pipelines
  • Prefabrication of pipe spools in our workshop in Wallern (AT)

Key figures:

  • 320,000 t piping (material P91)
  • 85 t supports
  • 30 t valves
  • 3,000 weld joints
  • 120,000 work hours

Place of execution: Toul (F)

Execution period: 2011 – 2012