Erection of a boiler for district heating with 40 MW (GER)

Project volume: 7,6 Mio. EUR

Project: Delivery, assembly, and commissioning of a boiler for district heating with 40 MW including district heating pumps, pipe system, steel construction, stack, electrical components, and process control. Disassembly of old components and necessary adaption of boiler house.

Scope of supply:

  • Project- and assembly management
  • Engineering (boiler, pumps, piping, valves, measuring points, steel construction, stack, electrical components, process control)
  • Material procurement (boiler, pumps, piping, valves, measuring points, steel construction, stack, electrical components, process control, special parts)
  • Delivery and erection of heavy components (boiler, stack)
  • Pre- fabrication and erection of the pipelines incl. the primary and secondary supports.
  • Erection of equipment (pumps, valves, measuring points, special parts)
  • Steel structures for air ducts and waste gas ducts, piping and stage structures
  • Insulation
  • Final inspection and commissioning

Location: Germany

Project period: 2017 – 2019